Engineering Works: On Saturday 25th & Sunday 26th January, all Hull Trains services will run to and from London St Pancras due to engineering works. Two services will run in each direction, view the timetable on our Engineering Works page.
Engineering Works This Weekend
Engineering Works: On Saturday 25th & Sunday 26th January, all Hull Trains services will run to and from London St Pancras due to engineering works. Two services will run in each direction, view the timetable on our Engineering Works page.
The ticket counter can be adjusted by the operator to suit either standing or wheelchair users height.
Accessible Public Telephones
Public telephones are not wheelchair accessible
Accessible Taxis
Accessible taxis are available to book
Accessible Ticket Machines
On platform 1
Customer Help Points
On platform
Impaired Mobility Set Down
Induction Loop
National Key Toilets
Booking Hall - Available during staffing hours
Ramp For Train Access
Staff Help Available
Monday to Friday – 05:45 to 19:10
Saturday – 05:45 to 19:10
Sunday – 07:30 to 16:00
Step Free Access
Category B1. This station has a degree of step-free access to the platform, which may be in both directions or in one direction only - please check details - Step free access to platform 1 for services towards London via main entrance. Step free access to platform 2 for services away from London, via path down from London Road. Step free interchange via road and steep paths is in excess of 400 metres. Stepped access between platform via the footbridge.